The plot sits on Al. Rzeczypospolitej, the main avenue of Miasteczko Wilanów, next door to Medicover Hospital and a short walk from the Temple of Divine Providence. The zoning plan allows a services-and-residential building of up to four storeys. The ground floor and level +1 are pre-let in principle to national tenants; levels +2 and +3 hold 68 apartments over two underground parking levels.

03Key figures
Plot
5,930m²
Above-ground storeys
4
Apartments
68
Net residential area (PUM)
2,816m²
Retail & services GLA
4,535m²
Underground parking spaces (2 levels)
162
Max height
14.5m
Zoning intensity
2.2
Zoning plan of Wilanów Zachodni, area 16 UM (services and residential).
04The building
04.88.511.514.5Al. Rzeczypospolitej
The building
14.5m

Programme, floor by floor.

Levels −1 / −2

Underground car park

162 spaces · 94 customers, 68 residents

Ground floor

Lidl · Rossmann · Starbucks café

1,690 / 360 / 165 m²

Level +1

Medicover clinic · Well Fitness

870 / 1,450 m²

Levels +2 / +3

68 apartments

2,816 m² PUM

Large lifts for shopping trolleys. 24-tonne deliveries. Two levels of parking under the building.

05Zoning

Designation

Services and residential (16 UM)

Height

Up to IV storeys, max 14.5 m

Building intensity

Up to 2.2

Built-up area

Max 45%

Biologically active area

Min 50%

Parking

On the investor’s own plot

06Architecture

Concept design: light architectural concrete, full-height glazing on the three upper storeys of equal height, and trees and planting along the avenue. Design to building permit to be commissioned after a design-office tender.

07Two ways to run it
EUR · full numbers · base case · before corporate income tax

Retail on the ground floor; apartments on levels +1 to +3 sold off-plan. Retail sold to an investor three months after opening.

102 apartments · 4,224 m² PUM

Total development cost

EUR 22,583,727

Development profit

EUR 3,054,037

Profit on cost

13.5%

Total equity

EUR 8,448,202

Bank loan (65% LTC)

EUR 13,961,012

AStructure

MIRO Holdings

67.5%

Georgiou Griva Digeni 106Mandona Court 1, office 422Limassol 3101, Cyprus

Land contributed in kind + cash equity

KRAM Holding sp. z o.o.

32.5%

al. Jana Pawła II 2200-133 Warszawa, Poland

Cash equity — 50% of the cash requirement

RZECZYPOSPOLITEJ 3 SPV

Ownership, financing, development, letting

KRAM Development

Development manager — development management and leasing

Bank

Construction loan up to 65% LTC

MIRO Holdings contributes the land in kind and 50% of the cash equity; KRAM Holding contributes the other 50% of the cash equity. SPV stakes pro rata to contributed equity: MIRO Holdings 67.5%, KRAM Holding 32.5%.

Bank financing up to 65% of cost at 5% interest.

Both scenarios share the same land, design and construction budget (8,000 PLN/m² usable area; underground parking at market average).

BModel 1 — Project result bridge (EUR m)

Net revenue

25.64

Development costs before financing

−21.48

Financing costs

−1.11

Development profit

3.05

CModel 1 — Sensitivity

What if apartment prices are different?

22,000
Base case 22,000
Model 1 development profit

EUR 3,054,034

Profit on cost

13.5%

Simplified illustration: costs and timing held at base case.

DKey assumptions
Apartment price

22,000 PLN/m² gross incl. 23% VAT

Construction

8,000 PLN per m² usable area (PUM/GLA)

Underground parking

90,000 PLN per space

Retail exit yield

7.5%

Bank financing

65% LTC at 5%

Design & permitting / construction

8 months / 24 months

Exchange rate

4.30 PLN/EUR

Lidl rent

18 EUR/m²/month

Café rent

23.26 EUR/m²/month

Grid rental (energy connection)

1,500 EUR/month

EV charging

2 chargers leased to an operator, 500 EUR/month each

Anchor tenants

Lidl, Rossmann, Medicover and Well Fitness have confirmed interest in long-term leases.

Zoning in place

Services and residential zoning plan, up to IV storeys.

Next to Medicover Hospital

Medicover Hospital at Al. Rzeczypospolitej 5 is next door.

Informational material based on KRAM Development’s concept financial models (base case), before corporate income tax. Figures and financing are indicative, not committed term-sheet amounts, and subject to due diligence, documentation and approvals. Not an offer or investment recommendation.

08Timeline

Nov–Dec 2026

Concept & design-office tender

Jan–Mar 2027

Design

Mar 2027

Building permit application

Apr–Jun 2027

General contractor tender

May 2027

Building permit (expected)

Jul 2027

Construction start

Jun 2029

Completion

Jul 2029

Opening

Oct 2029

Retail investment sale (Model 1)

09Location

Miasteczko Wilanów is an affluent, fast-growing residential district in south Warsaw. Al. Rzeczypospolitej is its main avenue, lined with shops and cafés. The site is next to Medicover Hospital, with the Temple of Divine Providence and Wilanów Palace nearby. Przyczółkowa provides direct access to the S2 expressway.

Straight-line distance from Rzeczypospolitej 3
10Partners

KRAM Development

Development manager

Polish developer of retail parks under the SHOPLAND brand.

Tenants

Lidl

Rossmann

Medicover

Well Fitness

11Data room

Financial models of both scenarios, the zoning extract and the concept design are available after signing a confidentiality agreement.

Contact

Andrzej Krauze

Business Development and Transactions, KRAM Development

ul. Marszałkowska 89, 00-693 Warszawa

+48 663 000 018

a.krauze@kramdevelopment.com